Our first investment for Leann Stańczyk SA:
https://en.cobouw.pl/project/leann-stanczyk-sa/

Leann Stańczyk is a family company dealing with wholesale of steel and CNC services.
The investment will be built in Słupsk, where the headquarters of Leann Stańczyk SA is located and where we have built the first production plant for this Investor.
The author of the architectural design is the design studio Colosseum. The detailed design of the hall structure was prepared by our designers.
- execution of the alternative detailed design of the hall structure
- earth works
- foundations
- delivery and installation of the hall with cladding
- installation of window and door joinery in the hall
- installation of gates, loading ramps, bumpers, dock seals and wheel guides
- construction of technical expansions
- construction of a galvanizing plant
- construction of a social and office building with finishing works
- flooring
The new hall will be maintained in a style consistent with the existing production plant built by us. The facility will be constructed in the Słupsk Special Economic Zone and will fit into the surrounding buildings.