Building a production hall – turnkey design and construction

Designer and contractor of production halls – why choose CoBouw?

CoBouw Polska builds production halls under the design-and-build formula throughout Poland. CoBouw designs and constructs production halls from 1,000 m² to 50,000 m² for the automotive, food, chemical, pharmaceutical, plastics, home appliance and electronics, and logistics industries. CoBouw manages the investment from the architectural concept, through the building permit, to final acceptance and the occupancy permit.

Our projects are delivered in the “build-to-suit” formula, combining modern design with cost efficiency and integrating social and office areas within the hall. We manage the entire investment process – from the concept phase and official formalities to construction and obtaining the occupancy permit. We also actively support investors in securing financing and EU grants. Thanks to our own team of engineers and installers, we take on even the most complex projects.

The CoBouw portfolio includes numerous projects for various industries, from chemical to food. Our industrial halls are functional, safe, and optimal in terms of cost and location, giving investors complete peace of mind in use.

Designing production halls – what is worth knowing?

Designing production halls requires compliance with occupational health and safety regulations and building standards that ensure safety, comfort and productivity. The minimum temperature in production areas should be at least 14°C, while in office and ancillary areas it should be at least 18°C. Lighting is equally important and should be at least 200 lx, rising to as much as 500 lx in areas requiring precision work. Designs take daylight into account wherever the production process allows. Ventilation provides adequate air exchange matched to the number of people and the nature of production, with a recommended minimum of half an air change per hour. Evacuation routes are designed in accordance with regulations – wide, marked, equipped with emergency lighting and completely free of obstacles. As a result, production halls combine safety, ergonomics and process efficiency, creating an optimal working environment and supporting production continuity.

Build a production hall with us that is perfectly suited to your needs!

Contact Us

Employee comfort and safety

Technical requirements, OHS and social facilities in production halls

When designing social facilities in production halls, we focus on comfort, safety and compliance with labour law. We design changing rooms with a minimum area of 0.3 m² per employee and equip them with individual lockers for storing personal and work clothing. We usually locate them directly next to washrooms and showers with hot and cold water, and adjust their number to the number of employees and the nature of the work performed.

Where more than 20 people work per shift, we provide a canteen with comfortable seating, meal-heating facilities and access to sinks. Toilets are designed close to workstations, changing rooms and washrooms, with their number matched to the size of the workforce.

All rooms are heated, ventilated and lit in accordance with standards, and for particularly dirty work we apply additional sanitary requirements. As a result, our solutions combine ergonomics, comfort and safety, creating a pleasant working environment and supporting the efficiency of the entire production process.

Frequently asked questions about production halls

The cost of building a production hall in 2026 ranges from PLN 2,500 to 5,000 net per m² of floor area. The price depends on three main factors: the type of structure (steel, reinforced concrete, hybrid), the technological equipment (installations, overhead cranes, air conditioning) and the location of the investment. Building a standard 5,000 m² production hall costs from PLN 12 to 15 million net.

Building a production hall takes 13 to 21 months on average. The design and permitting stage takes 4–6 months, and the construction stage takes 9 to 15 months. The design-and-build formula used by CoBouw Polska shortens the total investment time by 10–20%, thanks to running design work, administrative procedures and construction works in parallel, whereas in the traditional model they are carried out in sequence.

Building a production hall requires, above all, a building permit. Depending on the location and nature of the investment, a land development decision, an environmental decision, a water-law permit and – after construction is completed – an occupancy permit may also be required. CoBouw handles all administrative procedures on behalf of the investor as part of general contracting.

Building a production hall comprises 10 stages:
  • 1) pre-investment analysis and site selection,
  • 2) architectural and functional concept,
  • 3) building design and obtaining the building permit,
  • 4) earthworks and foundations,
  • 5) erection of the structure and the hall envelope,
  • 6) industrial floor construction,
  • 7) plumbing and electrical installations,
  • 8) finishing works,
  • 9) site development,
  • 10) technical acceptance inspections and obtaining the occupancy permit.
CoBouw guides the investor through all stages of delivery – from the investment analysis to handing over the finished facility for use.

The regulations do not specify a minimum height for a production hall as a building. They do, however, require that rooms for permanent work meet the minimum requirements set out in the occupational health and safety regulations. In practice, CoBouw designs production halls with a clear height of 6–12 m, adapted to the production process, the machinery used, overhead cranes and installation requirements.

CoBouw Polska production halls are designed in accordance with the applicable Eurocodes (the PN-EN 1990–1999 series), Polish Standards and building and OHS regulations. Steel structures are executed in accordance with PN-EN 1090, concrete structures in accordance with PN-EN 13670, and lighting is designed in accordance with PN-EN 12464-1. Before the facility is handed over for use, CoBouw coordinates the required technical acceptance inspections and obtains the necessary administrative decisions.

Yes. CoBouw Polska supports investors in obtaining co-financing from the European Funds for a Modern Economy (FENG), European Funds for Eastern Poland (FEPW), the National Recovery Plan (KPO) and regional programmes, as well as bank financing. We work with funding advisers and prepare the technical documentation required to apply for support. Grants can cover 30% to 80% of the eligible costs of the investment.

A production hall is used to carry out the production process – it contains workstations, process utilities, ventilation matched to the number of employees and social facilities. A warehouse is used to store goods – it has greater height for racking, lower ventilation requirements and limited ancillary facilities. CoBouw Polska also builds production and warehouse halls that combine both functions.