Steel halls

Modern steel halls designed with your business in mind

Steel halls adapted to production, storage and trade

Steel halls – comprehensive assembly and construction offer

As a general contractor, we provide comprehensive solutions for steel building construction that combine speed, flexibility, and cost optimization. We provide full investment management – ​​from concept and design, through production, to professional assembly of the steel structure and complete turnkey completion of the industrial facility.

Steel halls are used in many industries due to their exceptional versatility and ability to be adapted to the specific requirements of the investor.

We design and build production facilities for light and heavy industry, warehouse facilities, including high-bay warehouses, logistics centers, retail and service facilities, agricultural halls and sorting plants, as well as functional sports and recreational facilities that combine high durability with flexible design.

Advantages of steel halls

Why is it worth choosing steel halls?

Freedom of design
The plasticity of steel allows for the creation of impressive designs.

Fast turnaround time
Prefabrication of elements shortens construction time.

Flexibility and scalability
easy expansion and modernization.

Large spans
space without supports, free arrangement.

Contact us and ask about the construction of a steel hall.

With CoBouw Polska, your steel hall construction is in good hands.

Send inquiry

Comprehensive steel halls from CoBouw

Building steel halls – stages of the investment

Using the “design and build” model, we, as the general contractor, manage the entire steel hall construction process. This ensures smooth construction and complete budget control.

The project begins with site preparation – soil analysis, leveling, earthworks, foundation work, and utility connections. Simultaneously, steel elements are prefabricated in a specialized factory.

The hall assembly process involves the quick and precise assembly of the supporting structure and the installation of secondary components such as purlins and beams. The hall is then closed, with the walls and roof installed, along with flooring, gates, windows, skylights, and all necessary electrical and plumbing installations.

Thanks to our experience, we complete investments efficiently and on time, delivering ready-to-use halls in line with the investor’s expectations.



How much does it cost to build a steel hall? Main factors influencing the price.

Building a steel hall is an investment whose cost depends on many factors. There’s no single price, as each project is unique. Geometric parameters are key – the surface area, height, and span of the structure. Larger spans require a more robust framework. The facility’s intended use is also crucial – a production hall with an overhead crane will be more expensive than a standard warehouse.

The plot’s location also influences the investment cost – both in terms of climatic conditions (snow and wind loads) and logistical considerations, such as transport accessibility, which can increase the cost of material delivery and labor. Ground conditions, in turn, determine the cost of foundations – weak soil may require additional, more expensive piling.

The choice and thickness of the cladding materials (sandwich panels, sheet metal, insulation) also have a significant impact on the price, impacting both the purchase price and the subsequent operation of the facility (e.g., heating and cooling costs). The scope of plumbing, electrical installations, and additional equipment, such as overhead cranes or docks, also significantly increases the cost per square meter.

Hall and office in one investment

Steel halls with offices – production, warehouse and administration under one roof

A steel hall with an office combines the process area (production or warehouse) with administrative and welfare facilities in a single building. As the general contractor, CoBouw Polska designs and builds steel halls with office sections in the “design and build” model. We cover the concept, the building design, the steel structure, the installations and the turnkey fit-out of the offices. The investor has one contract, one schedule and one partner responsible for the entire facility.

Combining the hall with an office section improves day-to-day communication between management, administration, sales and the production team. It also allows the site to be used more efficiently and reduces the costs of maintaining separate office space. A properly designed office section underlines the character of the company and gives the whole facility a modern, cohesive look. A prestigious facade, a well-thought-out entrance zone and a well-designed massing make the building stand out, and from the moment visitors drive onto the company grounds it creates a professional, modern impression.

Looking for a reliable steel hall contractor?

Let’s talk about your project. Our experts will analyse your needs and prepare a preliminary concept with an estimated cost, free of charge.



Ask for a quote

FAQ

Frequently asked questions about steel halls

Steel is the structural material of the 21st century, valued for its excellent strength-to-weight ratio. Steel halls are lighter than reinforced concrete ones, which reduces the load on the foundations and lowers the cost of the entire investment. Thanks to prefabrication and the lower weight of the structural elements, erection is faster, and designers gain greater architectural freedom – large spans without internal columns are possible, giving flexible and functional hall interiors.

We design and build two main types of structures:
  • Plate girder (solid web) structures – aesthetic, with a lower structural depth, ideal for smaller spans.
  • Truss structures – lighter, ideal for large roof spans. The open-web design of the girders makes it easy to run the hall's internal installations within the depth of the roof structure (e.g. ventilation, sprinklers) without reducing the usable height of the hall.

The durability of a hall depends on its corrosion protection. We use two methods, selected according to the corrosivity category of the environment (from C1 to C5):
  • System painting (epoxy and polyurethane paints) – allows any colour and high chemical resistance.
  • Hot-dip galvanizing – immersing the elements in liquid zinc. This is the most durable protection, which protects the steel even if the coating is scratched (cathodic protection).

Steel itself loses its load-bearing capacity at high temperatures, so it must be protected. We use fire protection in the form of specialist intumescent paints (which form an insulating foam when heated) or encasement with plasterboard and mineral wool. As a result, the structures of our halls can meet the required fire resistance classes (e.g. R15, R30, R60).

Thanks to high-strength steel and truss structures, we can design halls with spans of 40-50 metres and more without any intermediate supports. This is crucial for aircraft hangars, sports halls or logistics centres, where columns obstruct movement.

This is an engineering process in which we aim to reduce the amount of steel used while maintaining full safety (in accordance with the Eurocodes). Our structural engineers select section sizes so that the steel "works" at 100% of its capacity. A lower structure weight (kg/m²) is a direct financial saving for the investor.

Yes, this is a huge advantage over masonry or monolithic reinforced concrete structures. Steel erection is a so-called dry technology. The elements arrive ready-made from the fabrication shop and are bolted together on site. Low temperatures do not interfere with erection, which allows the project to proceed all year round.

Yes, S355 steel is standard in our projects. It has much better strength parameters than standard structural steel (S235), which allows the use of lighter sections and slimmer structural elements.

They combine the advantages of concrete and steel. Most often we use (precast) reinforced concrete columns, which are very resistant to forklift impact and fire, together with a steel roof girder, which is light and economical. This hybrid arrangement is now the standard in large-area construction.

Yes. Our structures are joined with bolts (bolted connections) rather than welded on site. This means the hall can be unbolted in the future, transported and reassembled in another location, which makes it a mobile asset of the company.

The whole process takes place in a steel fabrication shop, under controlled conditions. The steel is laser or plasma cut, welded by automatic welding machines, then shot-blasted (cleaned) and painted. Ready-made elements arrive on site, which eliminates execution errors and reduces erection time to a minimum.

Of course. We design the structure to carry the dynamic loads from overhead cranes. We install crane runway beams directly on the steel columns or on the brackets of reinforced concrete columns. Steel handles the dynamic and fatigue loads generated by lifting equipment very well.

We design modern halls with a so-called load-bearing reserve for process loads, including PV panels. If you are planning a photovoltaic installation, we take it into account in the structural calculations, selecting suitably stiffer profiled sheeting and roof purlins.

For most permanent production, warehouse and industrial halls, a building permit is required. The law does, however, provide exceptions for certain temporary structures and structures related to agricultural production. For example: - temporary hall – a structure not permanently attached to the ground, intended to be dismantled or relocated, can be built on the basis of a notification, provided it is removed or relocated by the date indicated in the notification, no later than 180 days after construction starts; - structure related to agricultural production of up to 150 m² – a single-storey farm building or shelter of simple construction, subject to the conditions set out in the act, can be built without a permit and without notification; - agricultural structure of up to 300 m² – subject to the statutory parameters, it can be built without a building permit, but requires notification. A standard industrial or warehouse hall built for the needs of a business therefore requires a building permit as a rule.

For production, warehouse and logistics halls, a steel hall is usually a more economical solution than a traditional masonry hall. A steel hall, like reinforced concrete and hybrid halls, is largely made of prefabricated structural elements, prepared beforehand off site and then erected at the investment site. Prefabrication reduces the amount of work carried out directly on site, shortens the structure erection time and allows the project to move on to the next stages faster. Compared with traditional masonry technology, it also means less time-consuming wet work. In traditional masonry technology, a much larger share of the work is done directly on the construction site, which can extend the delivery time of the facility. The work also requires a sufficient number of skilled workers, and its progress can be more dependent on weather conditions. In unfavourable weather, this can further affect the work schedule and the completion date of the investment. The total cost of the investment is, however, affected by, among other things, the floor area and height of the hall, its purpose, the required spans, structural loads, the finishing standard and the scope of installations. The most important economic advantages of a steel hall are: - prefabrication of structural elements – most of the structure is prepared beforehand off site, - fast erection – ready-made elements are delivered to the site and joined according to the design, - lightweight structure – in many cases allowing the foundation scope to be optimised, - the possibility of large spans with a limited number of internal supports, - easier expansion – the structure can be relatively easily adapted to a future enlargement of the plant, - shorter investment delivery time – enabling production or the warehouse to start up sooner. That is why, for larger industrial facilities, a steel hall is often a more economical and faster-to-build alternative to a traditional masonry hall.

The cost of the investment depends primarily on the floor area and purpose of the hall, the size of the office section and the adopted finishing standard. The cost of 1 m² of office space is usually higher than 1 m² of the hall alone, because it includes, among other things, additional partitions, installations, heating, ventilation, possible air conditioning and interior finishing. The price is also affected by the chosen office variant (integrated, or an added building), the layout and number of storeys, the standard of the facade and entrance zone, the scope of welfare rooms and the installation and process requirements of the whole facility. That is why a reliable cost of building a hall with an office can only be determined once the investor's needs are known and a preliminary functional brief has been prepared. At this stage CoBouw Polska prepares a free preliminary concept with an estimated implementation cost.

Yes, a mezzanine for an office section or workstations can be designed in the hall. This makes use of the building height and leaves more ground floor area for production, storage or circulation. However, it should be remembered that a mezzanine has a specific technical definition and is not the same as a full, enclosed office storey. If an extensive set of enclosed rooms is planned above part of the hall, it may have to be designed as an additional storey. In both cases the office section must meet requirements concerning, among other things, room height, working conditions, ventilation, daylighting and safe circulation and evacuation. That is why we determine how the space above the hall will be used already at the concept stage of the facility.

We select the way of separating the office section from the production or warehouse area according to the function of the facility, the noise level and fire protection requirements. We use properly designed walls and floors that limit the transmission of sound and, where fire protection solutions require it, also partitions and doors of an appropriate fire resistance class. The correct layout of ventilation, heating and cooling installations and the way circulation between the two zones is arranged are also important. This helps limit the transfer into the offices of noise, dust, odours and other nuisances associated with the processes carried out in the hall.

Yes. The office and welfare section can be designed as a new volume adjoining the existing hall, and in some cases the space inside the building can also be used, e.g. by creating a mezzanine or an additional level. Before starting the design we carry out a survey of the existing facility and analyse its structure, foundations, installations and current fire protection solutions. We also check the options for developing the plot and connecting the new part to the operating hall. Such an expansion generally requires the relevant decisions and a building permit. As part of general contracting, we can guide the investor through the entire process – from analysing the expansion options and the design, through the formalities, to the construction works.

There is no single universal ratio of office area to hall area. Its size depends primarily on the number of employees, the organisational structure of the company, the nature of its operations and the additional functions to be housed in this part of the building. In warehouse and logistics halls, the administrative facilities may take up a relatively small part of the building. In production plants that also need rooms for a technical department, quality control, a laboratory, conference rooms or a showroom, the office section can be much more extensive. At the concept stage we establish the functional brief and the expected number of users. If the investor anticipates further growth of the company, we can also allow for a future increase in office space or headcount.

Office section options in a steel hall

We design the layout of the office section individually – taking into account the function of the facility, the technology of the operations, the size of the plot, the number of employees and the potential for future expansion.

Office integrated into the hall envelope

Visualization of the office building of the Bardusch clothing service hall

The office, administrative and welfare section is located within the footprint of the main building, most often on the front side. This makes it possible to create a compact and functional facility in which the offices remain directly next to production or the warehouse. Such a solution works well both in smaller halls and in facilities where efficient use of the plot is the priority.

Mezzanine or office section above the hall

In suitably designed facilities, part of the administrative functions can be located on a mezzanine or on an additional storey above part of the hall. This makes use of the building height and leaves more ground floor area for production, storage or circulation.

The choice of a specific solution depends on the functional layout, the structure of the building and requirements concerning, among other things, fire safety, evacuation, room height and working conditions. A mezzanine is not the same as a full, enclosed office storey, so the way this space is used is determined individually at the design stage.

Office room 1 - fruit sorting plant with an office section, for Europejskie Centrum Owocowe, Rębowola

Adjoining office and welfare building

In larger production and warehouse facilities, the administrative section can form a clearly separate volume connected directly to the hall. It can be one or several storeys high and house, among other things, offices, conference rooms, reception, changing rooms and welfare rooms. Such a solution gives more freedom in shaping a prestigious front facade and entrance zone.

Separate office building linked to the hall by a connecting corridor

When the nature of the business requires greater separation of administration from production, the office can be a separate building connected to the hall by a connecting corridor. This reduces the impact of noise and process traffic on the office workspace while maintaining a convenient link between the two parts of the facility.

Visualization of the Beczkopol hall production section with a technological connecting section

Warehouse hall with an office and production hall with an office

In a warehouse hall with an office, the administrative section is usually located directly next to the dock, receiving and order-picking areas. This gives warehouse management a good view of ongoing logistics processes, and the handling of drivers and deliveries can take place in a separate, properly designed zone.

In a production hall with an office, welfare facilities for employees play an important role, including changing rooms, washrooms and dining areas. We locate the offices of the technical, quality and production supervision departments as close as possible to the process area, to improve communication and process control. A frequently used solution is also glazing that gives a direct view into the hall.

You can find out more about the specifics of this type of facility on the pages warehouse halls and production halls.

What we decide at the design stage of a hall with an office

The office section and the hall have different functional, technical and installation requirements. That is why we design them from the start as a single, cohesive facility. Already at the concept stage we make decisions that affect later comfort of use, safety, operating costs and the potential for the investment to grow:

  1. Fire safety.

    We analyse how the individual parts of the facility will be used, the division into fire zones, escape routes and the requirements for fire resistance and partitions. We select solutions according to the function of the hall, its floor area, the process operations and the type and quantity of stored materials.

  2. Thermal and acoustic comfort

    We select thicker insulation and partitions that dampen machinery noise. The office maintains a constant office working temperature, while the hall can be heated to lower parameters.

  3. Installations

    We design mechanical ventilation with heat recovery, air conditioning, low-voltage installations and a LAN network, as well as separate utility meters.

  4. Daylight and room height

    Rooms for permanent work must meet the requirements of the technical regulations and health and safety rules. Adequate daylight, room height and proper working conditions therefore already influence the massing and functional layout of the building.

  5. Reserve for expansion

    We plan the position of the building, the structural layout of the hall, the routing of installations and the site development in such a way as to leave space and technical capacity for further growth of the facility. As a result, a future enlargement of the production or storage part can proceed more smoothly and with less interference with the operating office section.

We coordinate all trades in BIM technology, and prepare visualisations and the functional layout of facilities with CoBouw Design Lab. This allows us to identify possible clashes between the structure and the installations at the design stage, before work starts on site.

If you are planning to increase your industrial floor space and add an office section to an existing hall, see our offer of expansion of existing facilities. We write more about the possibilities and functionality of such a solution in the article steel hall with an office – functionality, construction and applications.