General contractor for production and warehouse halls

Production and warehouse halls under the "design and build" formula

Production and warehouse halls are facilities with very specific requirements – they must combine smooth production processes with efficient internal logistics. When delivering the construction of a production and warehouse hall under the “design and build” formula, we take responsibility for the entire process: from analysing the investor’s needs and the architectural concept, through the building and construction design, to execution and acceptance of the facility. The investor gets one partner, one contract and one warranty for the entire investment.

We plan the layout of the production, storage, and receiving and dispatch zones with precision, so that semi-finished and finished products move without conflicts in line with lean management principles. We pay attention to the key technical requirements – floor load capacity and flatness, appropriate storage height, access to daylight and ventilation systems matched to the technological processes. We integrate warehouse automation, loading docks, social facilities and office areas, creating comprehensive and efficient facilities.

Building production and warehouse halls is our specialisation – we deliver facilities for companies in the automotive, food, pharmaceutical, chemical and plastics processing industries, as well as logistics and e-commerce. We design each hall individually, delivering complete, reliable solutions ready to support the growth of the client’s production operations.

The construction process for production and warehouse halls

Stages of building a production and warehouse hall – the investment process step by step

Building a production and warehouse hall under the “design and build” formula comprises 10 key stages: pre-investment analysis, development of the architectural and functional concept, preparation of the building design and obtaining the building permit, earthworks and foundations, construction of the structure and envelope, the industrial floor, plumbing and electrical installations, finishing works, site development, and technical acceptance inspections ending with the occupancy permit and handover of the finished facility to the investor. The typical delivery time for a project of 3,000 to 20,000 m² is around 12 months from contract signing.

  1. Pre-investment analysis

    Verification of the plot against the local zoning plan or development conditions, geotechnical surveys, analysis of utility availability (electricity, gas, water, sewage) and assessment of the road layout for heavy transport. The stage ends with a recommendation of optimal solutions and the preparation of a preliminary investment budget.

  2. Architectural and functional concept

    Development of the functional layout of the facility, taking into account the investor’s technology, production lines, storage zones, circulation routes and fire protection requirements. The stage also includes defining the parameters of the hall and the social and office section, and preparing a visualisation of the facility, which forms the basis for further design work.

  3. Building design and building permit

    Preparation of complete design documentation, including the site development plan (PZT), the architectural and building design (PAB) and the technical design (PT), together with the required trade coordination and expert opinions (fire safety, OHS, sanitary). CoBouw Polska guides the investor through the entire administrative process – from preparing the documentation to obtaining a final building permit.

  4. Earthworks and foundations

    Excavation works, preparation and compaction of the subgrade, and construction of foundations suited to the ground conditions and the loads of the designed facility. In demanding geotechnical conditions, indirect foundations such as piles or displacement columns are used.

  5. Structure and envelope

    Erection of the steel or reinforced concrete frame, installation of sandwich wall panels and the roof covering, and installation of windows, doors, gates, loading docks and roof skylights.

  6. Industrial floor

    Construction of the sub-base, insulation, reinforcement and the concrete industrial floor, designed for the planned loads and the way the facility will be used. The stage ends with a durable, abrasion-resistant surface suited to forklift traffic, high-bay racking and production lines.

  7. Plumbing and electrical installations

    Execution of all internal installations, including water and sewage, heating, ventilation, air conditioning, gas, electrical and telecommunications. The stage also includes installing lighting and security systems and preparing the facility for the start-up of the investor’s technology.

  8. Finishing works

    Comprehensive finishing works, including plastering, painting, ceramic tiling, installation of suspended ceilings, internal joinery, balustrades, sanitary fittings and other finishing elements of the production, storage and social and office areas.

  9. Site development

    Construction of internal roads, manoeuvring yards, car parks and pavements, as well as the drainage and external lighting systems. The stage also includes external connections and networks, fencing, green areas and the remaining infrastructure needed for the facility to operate properly.

  10. Technical acceptance and occupancy permit

    Acceptance inspections of all trades, the required tests, measurements and surveys, and compilation of the as-built documentation. The stage ends with obtaining the occupancy permit and handing the facility over to the investor, ready for operation

Location of a production and warehouse hall – choosing a plot for your investment

Choosing the location of a production and warehouse hall is one of the most important decisions at the investment planning stage. It determines future operating costs, logistics efficiency, access to skilled employees and the options for further expansion of the plant. CoBouw Polska supports investors in analysing and selecting the optimal plot, verifying, among other things, compliance with the local zoning plan or development conditions, availability of utilities, transport links and the potential of the business environment.

The greatest benefits are offered by sites located in industrial parks, technology parks and areas covered by the Polish Investment Zone (PSI). Such locations provide fully serviced land, convenient access to road and technical infrastructure, and the possibility of using attractive tax incentives. Another important advantage is proximity to academic centres and industrial hubs, which makes it easier to recruit qualified staff, as well as a location close to motorways, expressways and intermodal terminals, which streamlines the transport of raw materials and finished products.

Depending on the location and nature of the investment, companies can also apply for financial support from national and EU funds, such as the KPO, the European Funds for a Modern Economy (FENG) or regional European Funds programmes. The available instruments can significantly reduce the cost of the investment. More information can be found on the page dedicated to grants and investment financing.



Construction cost estimate

Cost of building a production and warehouse hall – what the price per m² depends on

The cost of building a production and warehouse hall in 2026 is approximately PLN 2,500 – 5,000 net per m² of usable area. The lower range applies to simple steel halls of over 3,000 m² with basic equipment. The upper range applies to facilities with an extensive production section (high fire safety requirements, process ventilation, guaranteed power supply). The final price per m² depends on the structure, fire safety requirements, the size of the facility, ground conditions and the standard of finish of the office and social section.

Cost of building a production and warehouse hall – what the price per m² depends on
Cost item Approximate share of the investment budget
Design, documentation and obtaining the building permit 2–5%
Earthworks and foundations 8–15%
Load-bearing structure (steel or reinforced concrete) 20–30%
Wall and roof envelope (sandwich panels, joinery, skylights) 15–20%
Industrial floor 5–10%
Internal installations (electrical, plumbing, HVAC, fire protection, telecommunications) 20–30%
Office, social facilities and finishing 5–12%

We have extensive experience in designing and building production and warehouse halls.

Find out what we can do for you.

Contact us

Production and warehouse halls ready for growth

A production and warehouse hall ready for extension – designing with the future in mind

We design CoBouw Polska production and warehouse halls with the growth of the business in mind. Already at the concept stage, we allow for future extension of the facility, changes to the layout of the production and storage zones, and adaptation of the installations to new processes and technologies.

The structure of the building, the floors and the installations are designed so that modernisation and extension can be carried out efficiently with minimal disruption to the operation of the plant. We also use solutions such as lightweight gable walls, which can easily be dismantled when the hall is extended, without having to rebuild the entire facility.

As a result, the investor gets a hall that not only meets the company’s current needs, but also allows it to grow further without costly and time-consuming rebuilding. It is a solution that increases the flexibility of the investment, reduces future modernisation costs and ensures the long-term value of the facility.



Warehouse and production hall

What is a production and warehouse hall?

A production and warehouse hall is an industrial facility that combines two functions in a single building – a manufacturing zone (production) and a zone for storing raw materials and finished goods (warehouse). Halls of this type are the most commonly chosen form of investment among SME manufacturing companies, because they shorten internal transport routes, reduce construction costs (shared foundations, walls and utility connections) and simplify facility management.

A typical CoBouw production and warehouse hall covers an area of 1,000 to 15,000 m² and is built with a steel, reinforced concrete or hybrid structure. The production and storage zones are separated by an internal fire separation wall (REI), which also acts as an acoustic barrier. Each zone has independently selected technical parameters: floor load capacity, usable height, heating and ventilation system, and process installations. The office and social section is designed as a front extension or a mezzanine inside the hall, depending on the layout of the plot.

Visualization of the side elevation of the hall for a fire door manufacturer, surrounded by greenery

FAQ

Frequently asked questions about building production and warehouse halls

The cost of building a production and warehouse hall in 2026 starts at around PLN 2,000 net/m² (simple steel halls of over 3,000 m²) and reaches PLN 4,000/m² for facilities with extensive process installations. The final price depends on the structure (steel vs. reinforced concrete), fire safety requirements, ground conditions, the standard of finish of the office section and the location. We price each investment individually after preparing the concept.

Delivering a production and warehouse hall usually takes 12 to 24 months, from contract signing to obtaining the occupancy permit and handing the finished facility over to the investor. The design stage, including obtaining the necessary administrative decisions, usually takes 4 to 8 months, depending on the scope of the investment and whether an environmental decision is required. The construction stage takes 8 to 16 months on average, and its length depends primarily on the floor area of the facility, the technology used and the complexity of the installations. Building a hall of around 3,000 m² most often takes 12–15 months, while delivering a facility of around 10,000 m² takes 15–18 months from the date of contract signing.

Building a production and warehouse hall requires the relevant administrative decisions, the scope of which depends on the location and nature of the investment. Where there is no local zoning plan, a development conditions decision is required, and for selected projects also an environmental decision. The key stage is obtaining the building permit, and after the works are completed and the required acceptance inspections are carried out, the investor obtains the occupancy permit. Preparing the investment also requires coordination and opinions required by law, including in the area of fire protection and – depending on the type of facility – other trades and institutions. As the general contractor, CoBouw Polska guides the investor through the entire administrative process – from preparing the design documentation to obtaining the occupancy permit.

Yes. CoBouw Polska builds production and warehouse halls across the whole country. We design and build industrial facilities under the "design and build" formula, regardless of the location of the investment. Our head office is in Łódź, and our branch in Rzeszów (Carpatia Biznes Park) supports the delivery of investments in south-eastern Poland. We have completed projects in many regions of the country – from West Pomeranian to Podkarpackie Voivodeship. Thanks to experienced design and construction teams, we provide comprehensive support at every stage of the investment, from plot analysis and design, through obtaining the building permit, to handing over the finished facility for use.

CoBouw Polska designs and builds production and warehouse halls for companies from many sectors of industry and logistics. We deliver facilities for, among others, the automotive, heavy industry, pharmaceutical and chemical, food, plastics processing, home appliance and electronics industries, as well as for logistics and e-commerce companies. Each investment is designed individually, taking into account the specifics of the production process, technological requirements, fire and sanitary regulations, and the needs related to installations and technical infrastructure. More information about our experience in individual sectors can be found in the "Industries we build for" tab.

It is a hybrid facility that combines, under one roof, a zone for manufacturing goods (production) with a zone for storing raw materials and finished products (warehouse). It is the most popular type of investment in the SME sector, because it allows maximum optimisation of logistics processes. Raw material "enters" through one gate, passes through the production line and, as a finished product, goes directly onto the racking and then to the shipping docks.

The main benefit is operational efficiency. We eliminate costly transport between distant buildings. In addition, the investor saves on construction costs (shared walls, foundations, utility connections) and on operating costs (shared security, facility management). It also means better communication between the production and logistics departments.

We physically divide the hall with internal walls. They often play a dual role: fire separation walls (REI) and an acoustic barrier. Thanks to the use of sandwich panels with a mineral wool core or masonry walls, noise and dust from production do not reach the clean storage zone.

Usually not. The warehouse section often has a much higher fire load density (a lot of combustible goods per m²), which requires it to be separated as a distinct fire zone. At CoBouw we design fire barriers (REI gates and walls) that prevent a potential fire from spreading from one zone to the other, which is key for safety and for the insurance conditions of the facility.

This is a major engineering challenge. Production often requires higher temperatures (for people's comfort) and intensive ventilation (removing heat gains from machinery). The warehouse can be cooler. We design independent climate control systems. In the storage section we use radiant heaters or unit heaters, and in the production section – ventilation with heat recovery. We often use waste heat from production to supplement the heating of the warehouse.

It often differs in the column grid and height. The warehouse section is usually taller (high-bay storage) and has a sparser column grid to give trucks freedom of movement. The production section may be lower, but may require a denser column grid for overhead cranes or suspended installations. As the General Contractor, we combine these two structural layouts into a single, coherent building.

The key is the process flow. We design the layout of gates and docks so that traffic flows smoothly: Receiving zone (raw materials) -> Production buffer -> Production line -> Quality control -> Finished goods warehouse -> Dispatch zone (Shipping). We avoid crossing transport routes, which minimises the risk of forklift collisions.

Yes. We most often design an office building attached to the front façade or an office mezzanine inside the hall. Offices are usually located closer to the production zone (for supervision), but with adequate acoustic insulation. A mezzanine is a great way to save plot area.

No, we optimise costs by differentiating the floor parameters. In the storage zone (under the racking) the floor must carry the greatest point loads. In the production zone, resistance to machine vibration or chemicals may matter more, and the load capacity may be lower. We design different sections of the floor slab, separated by construction joints.

In addition to standard utilities, the key elements are guaranteed power supply (generators) to sustain production processes, and IT systems linking production with the warehouse management system (WMS). Lighting is also important – in the warehouse controlled by motion sensors, in production providing constant, high lux levels.

Yes. We work with the Client's process engineers. At the concept stage we mark the planned production lines and racking layout on the floor plan. This allows us to place utility connections (electricity, compressed air) precisely in the floor or from above, exactly where the machines will stand, avoiding "pulling cables" across the finished hall later.

When designing a hybrid hall, we always take the so-called development plan into account. We locate the building on the plot so as to leave a land reserve for the extension of both the warehouse and the production section. We design the gable walls as "lightweight", easy to dismantle during future expansion.

Definitely. We have one construction site, one permit, one design and one crew. The cost of duplicating external walls disappears, and the installations are centralised. The economy of scale allows a significant reduction in the cost per square metre of the investment.